
VIRDI-Fpwork User Guide
36
UNION COMMUNITY Co., Ltd. / 3F Hyundai Topics Building
44-3 Bangi-dong, Songpa-gu, Seoul, Korea (138-050)
■ Click the [Employee Number] button and select an employee.
After designating a period and searching results during a period of dates set
for change, double click an item to change and modify time and attendance
results. When change is completed, press the [Change Result] button to save.
■ To delete changed time and attendance results, check the [Delete changed
time and attendance result] item and execute time and attendance
processing.
2-3-7 Monthly Summation Change
[Figure 2-3-7-1 Monthly Summation Change]
■ Monthly summation results for each employee can be changed.
■ Click [Employee Number] to select an employee. Designate a period and
select [View Result].
When all summation results are displayed, change the item to be modified.
Then, press the [Change Result] button to save.
2-4. Search
http://www.unioncomm.co.kr
Comentarios a estos manuales